This update features the following changes:
- Additional generators connected to the network now require synchronization (new mechanic, UI etc)
- Black Start mechanic and UI added for events when all generators fail
- Added UI for altering load sharing between generators
- Fixed load not connecting when on the outter ring of the substations range
- Changed criteria for failing heatwave and coldsnap missions to be around loads losing supply rather than equipment failure
- Added option to disable power generator load shedding loads when losing reliability
- Added new advanced training video for the associated new features for multiple generators on the same network
- Other minor bug fixes